PEX plumbing Sales
PEX Coupons, PEX Discount, PEX Promo Codes

Archive for March 2011

Floor heating system with PEX tubing

March 1, 2011

Pouring concrete is carried out after mounting the contours of water floor heating and testing activities. The thickness of the screed must be at least 30mm above the pipe, grade of concrete is not recommended below the M-300 (B-22, 5). In special cases (big weight and / or thermal loads on the heating plate, etc.), […]