PEX plumbing Sales
PEX Coupons, PEX Discount, PEX Promo Codes

Archive for August 2011

Advanced Radiant Design

August 5, 2011

For this purpose we prepared samples as indicators of varying degrees of purity were on the canvas within the requirements of technical conditions, that is no more than 2 vkl./mm2, Plastic and other options that are installed in existing PEX systems during the heating season in 2004 and 2005 in Chicago. After the end of […]

PEX connection radiant heating PEX pipe with oxygen barrier

August 5, 2011

Analysis of new technical requirements on the chemical composition of Plastics show their compliance with existing regulatory documents on the main elements (C; Mn; Si), while on the harmful impurities (S; P) in Plastics provide more stringent requirements. Since the sulfur content is reduced to 3 times for carbon Plastic and almost twice for low-alloy […]